Summary
Overview
Work History
Education
Skills
Affiliations
Languages
Personal Information
Training
Timeline
Generic
Aoun Alsulieman

Aoun Alsulieman

Kitchener

Summary

Aoun Alsulieman is a Senior Landscape Engineer with 15+ years of rich experience in the areas of construction management, planting sweet soil, Plants, Irrigation network, Hardscape, quality management, field engineering, project management, HSE and sustainability with large and reputed organizations and projects. His expertise gained through extensive experience has been fine-tuned and honed by various internationally recognized Training like Project Management Professional (PMP), LEED GA. He has gained extensive hands-on experience in diverse project types like Parks, 5 stars hotel, Roads, Palaces, Schools, Roof planting, infrastructure and multiple construction sites. Effective communication and coordination skills with diverse multinational teams from all parties, the client, site teams, subcontractors and engineering department, in order to solve technical and organizational problems and to meet deadlines.

Overview

17
17
years of professional experience

Work History

Senior Landscape Engineer

KEO Project Management & Construction Management International
04.2019 - Current
  • Acts as the Company representative with the client and selected subcontractors during the program execution, Negotiates changes to the scope of work with the client and contractor
  • Managing the team of soft landscape, Irrigation, Survey and safety and giving them direction to ensure work is ongoing with required quality and in safe manner
  • Provide commercial and planning team with required information
  • Responsible for following up on instructions and commitments associated with the project
  • May participate in negotiations with regulatory agencies and in public meetings in support of clients
  • Supervising with contractors on all aspects of softs-cape and Hardscape construction
  • Soft scape, including plants, material inspection (On site, at local nurseries and over-seas), on site planting and associated landscape elements (Soil mixing, levelling)
  • Hard scape, including exterior stonework, paving of roadways, wood decking, site furnishing, Artificial Rockworks GRC, Retaining wall, Natural rock grouping
  • Irrigation, including Designing of Network, Hydraulic calculation analysis, electrical wiring, control programing, irrigation Central Control with Radio Wave Controller (RTU), material, TSE line installation, Irrigation distribution chamber… etc
  • Oversees establishment of Project Execution Plan, Health and Safety Plan, Quality Assurance/Quality Control Plan, and other documents as required
  • Works with other managers, project engineers, and discipline leads to develop schedules, and plans for the various elements of a project
  • Onsite design modifications and implementation of additional client’s requests
  • Cost analysis based on Landscape Drawings, estimates and materials required as well as manpower involved
  • Ensure that all recourses of materials, manpower, plants and equipment are available at all sites in a timely manner for proper progress of landscaping works
  • Ensure that work at all sites is proceeding according to program and to the required standards, in accordance with approved designs and instruction issues
  • Follow up the progress of all ongoing site work on a frequent basis to ensure timely and proper completion of site work
  • Supervise the preparation of landscaping AS-Built drawings.

Landscape Engineer

AECOM Middle East Limited
08.2015 - 04.2019
  • Review the design including all stages up to IFC drawing achieving all requirements from municipality and PPD and public realm department
  • Supervising with contractors on all aspects of softs-cape and Hardscape construction
  • Soft scape, including plants, material inspection (On site, at local nurseries and over-seas), on site planting and associated landscape elements (Soil mixing, levelling)
  • Hard scape, including exterior stonework, paving of roadways, wood decking, site furnishing, Artificial Rockworks GRC, Retaining wall, Natural rock grouping
  • Irrigation, including Designing of Network, Hydraulic calculation analysis, electrical wiring, control programing, irrigation Central Control with Radio Wave Controller (RTU), material, TSE line installation, Irrigation distribution chamber… etc
  • Review and approval of shop drawings, materials samples, mockup etc
  • In connection of hardscape and softscape
  • Onsite design modifications and implementation of additional client’s requests
  • Cost analysis based on Landscape Drawings, estimates and materials required as well as manpower involved
  • Participating in the preparation of periodical progress report, correspondence with client, project managers and contractors
  • Co-coordinating and liaising with other sections of the municipality and public park department and public realm (workshop, nurseries, transportation department, etc ..) contractors and other third parties as necessary for the progress of works
  • Work proactively to resolve any problems or site issues as they occur in connection with hardscape and Landscape
  • Ensure that all recourses of materials, manpower, plants and equipment are available at all sites in a timely manner for proper progress of landscaping works
  • Ensure that work at all sites is proceeding according to program and to the required standards, in accordance with approved designs and instruction issues
  • Follow up the progress of all ongoing site work on a frequent basis to ensure timely and proper completion of site work
  • Supervise the preparation of landscaping AS-Built drawings.

Landscape Projects Manager

Regency pools & Landscaping
12.2012 - 06.2015
  • Review the project file, contractual documents etc
  • And discuss issues, if any, with the concerned manager, obtain clarifications from the consultant / client where required
  • Liaise with the Planner to develop the Project Work Plan , Schedule to ensure that all activities are accounted for in the baseline programmer and the Work Breakdown Structure (WBS) reflects the BOQ in details
  • Check for any errors in sequence of activities and logical relationships between activities
  • Ensure that resource requirements have been accurately identified and determined according to the activity durations and overall project timeline, forward the resource requirements to the concerned functional departments for the planning of materials and equipment and sourcing of manpower
  • Coordinate with the concerned functional staff to develop preliminary submittals such as materials, Drawings, HSE Plan etc
  • To be submitted to the consultant and obtain approval from the consultant on all submittals including the baseline programmer before initiating the executing works
  • Make sure that the project staff is well trained for the work to be performed Project Mobilization
  • Ensure that all permits and licenses have been obtained prior to start of work Project Execution
  • Carryout mobilization meetings internally with the project team members and with the consultant, client to clarify any issues
  • Execute the project and manage day-to-day operations, ensure that all resources are available to the project team members on time as planned
  • Ensure that all variations orders received are officially approved by the consultant, client before initiating the variation order
  • Monitor and supervise designers to make sure construction execution goes according to plan
  • Coordinate with civil, MEP Project Engineers and Construction Manager
  • Assist in preparation of necessary documents for client.

Landscape Engineer

Boom General Contractors
12.2011 - 12.2012
  • Execute the outdoor landscaping, and irrigation project as per design and specification
  • Layout plan of approved drawing and possible change in as built drawing for better option
  • Preparation of method of statement Soft landscape and Irrigation works
  • Organize Manpower and machinery for maximum resource utilization
  • Supervising the fertilizer application to meet the requirement of Client standard
  • Supervising soil component of planting medium ensuring free from rock, soil debris, sufficient soil moisture, homogeneous mixing of soil additives
  • Supervising the plant material: Tree, Shrubs, Ground cover ensuring there health disease and pest free before planting
  • Supervision and monitoring of application of Plant Protection Agro -chemicals and Organic & In –Organic Fertilizers
  • Ensures all relevant safety objectives and legal requirements are observed
  • Check instructions are being carried out
  • Implement daily work activity in accordance with the standard specification of the project, methodology and agreed completion dates of every works
  • Taking responsibility for a team of engineers and training junior engineers and foremen
  • Prepare all paper works related to the project (RFI, MIR, submittals etc)
  • Drafting contract administration correspondence
  • Handing over consultative all completed works.

Project Engineer

Sidra Agriculture Co.
01.2008 - 12.2011
  • Execute the outdoor landscaping, and irrigation project as per design and specifications
  • Work with the team assisting all landscape staff
  • Liaise with subcontractors and prepare reports to project manager
  • Supervise the works at site in order to complete the project on time with quality and standards
  • Prepare materials, machinery and manpower requirement as per site condition
  • Supervise all kind of outdoor plants maintenance activities which include lawn mowing, grafting and pruning of shrubs & trees, fertilizing the lawn & all the plants, disease control, and maintenance equipment’s etc
  • Prepare all paper works related to the project (RFI, submittals etc)
  • Drafting contract administration correspondence
  • Ensures project is fit-for-purpose and adheres to the project budget and schedule
  • Ensures all relevant safety objectives and legal requirements are observed
  • Taking responsibility for a team of engineers and training junior engineers and foremen
  • Handing over consultative all completed works
  • Visit site to assess site conditions, accessibility and availability of services
  • Assist and supervise labors in layout of the project
  • Supervise the execution of works
  • Implement daily work activity in accordance with the standard specification of the project, methodology and agreed completion dates of every works
  • Check the design specification of the project if properly implemented.

Education

MBA

Bachelor of Agricultural Engineering -

Tishreen University
Lattakia, Syria
01.2006

Skills

  • Project Management
  • Project Planning
  • Technical reporting
  • Engineering Documentation
  • Quality Control

Affiliations

  • Syrian Agriculture Engineering Syndicate 2006
  • UPDA Grad A
  • Qatar Green Building Council

Languages

Arabic
English

Personal Information

  • Title: Senior Landscape Engineer, PMP Accrediataion no. 3649616
  • Nationality: Syrian

Training

  • Project Management Professional (PMP) by New Horizons.
  • Green Building Principles & LEED V4 Core Concepts Program by Qatar Green Leaders.
  • Global Anticorruption 2016 By AECOM University.
  • Training seminar (Landscaping management Tips & Tricks for improving Efficiency & reducing cost) by MECTON Qatar.
  • General English course certificate by Qatar chamber of commerce & Industry.
  • Consolidated Permit to work certificate by QP, CPW
  • Electronic Consolidated Permit to work certificate by QP,E-CPW
  • Conflict of interest by AECOM University.

Timeline

Senior Landscape Engineer

KEO Project Management & Construction Management International
04.2019 - Current

Landscape Engineer

AECOM Middle East Limited
08.2015 - 04.2019

Landscape Projects Manager

Regency pools & Landscaping
12.2012 - 06.2015

Landscape Engineer

Boom General Contractors
12.2011 - 12.2012

Project Engineer

Sidra Agriculture Co.
01.2008 - 12.2011

MBA

Bachelor of Agricultural Engineering -

Tishreen University
Aoun Alsulieman