Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
Anilkumar Jani

Anilkumar Jani

Kitchener,Canada

Summary

“Each day, our colleagues honor their authentic selves by bringing passion and commitment to our shared mission.”

Construction professional prepared to deliver exceptional site management and project oversight. Recognized for maintaining high standards, fostering team collaboration, and adapting to changing project needs. Skilled in safety compliance, resource allocation, and timeline management.

Overview

49
49
years of professional experience

Work History

Site Engineer

Kusiar Project Services
05.2024 - 11.2025
  • Inspected welding, piping, and pressure testing activities.
  • Verified material traceability and documentation.
  • Supported QA audits and client walkthroughs.
  • Used Bluebeam for digital reporting.
  • Working on hydro-structures like intake and manhole systems.
  • Dredging lake beds for micro-tunneling operations.
  • Zebra Mussel and Raw Water Sampling Systems.

Quality Inspector

Dragados Canada Inc.
BC
11.2019 - 10.2023
  • Technical Oversight: Ensures that construction work aligns with design specifications, engineering standards, and safety regulations.
  • Site Supervision: Monitors day-to-day activities on the construction site to maintain quality and progress.
  • Problem Solving: Addresses technical issues that arise during construction and provides practical solutions.
  • Coordination: Acts as a link between the design team, contractors, and project managers to ensure smooth communication.
  • Quality Control: Checks materials and workmanship to meet required standards.
  • Documentation & Reporting: Maintains records of work progress, inspections, and compliance reports.
  • Peace River Hydroelectric Dam

Field Engineer

Tetra Tech Infrastructure and Environment
John D’or Prairie, AB
07.2018 - 07.2019
  • Site Management: Oversees daily operations on the construction site.
  • Safety Compliance: Ensures adherence to safety regulations.
  • Scheduling & Coordination: Manages timelines and coordinates subcontractors.
  • Quality Control: Ensures work meets design specifications and standards.
  • Raw Water Treatment Plant

QA/QC Inspector

Metalcare Group Inc.
AB
11.2014 - 07.2018
  • Conducted inspections on concrete, rebar, and structural steel installations.
  • Ensured compliance with federal and state construction codes.
  • Coordinated with subcontractors and project engineers for corrective actions.
  • Maintained detailed inspection logs and NCR reports.
  • Steel piling and concrete foundation construction for large-scale Projects
  • Managed the installation of foundations for tanks, sumps, and E-houses.
  • Suncor Fort Hills Secondary Extraction Project

Field Engineer

FWS Industrial Project Canada Ltd.
Fort McMurray, AB
04.2014 - 11.2014
  • Conducted inspections on concrete, rebar, and structural steel installations.
  • Ensured compliance with federal and state construction codes.
  • Coordinated with subcontractors and project engineers for corrective actions.
  • Maintained detailed inspection logs and NCR reports.
  • CNRL-Horizon Oil Sands Project

QC Civil Inspector

TR Canada Inc.
Fort McMurrey, AB
10.2012 - 03.2014
  • Conducted inspections on concrete, rebar, and structural steel installations.
  • Ensured compliance with federal and state construction codes.
  • Coordinated with subcontractors and project engineers for corrective actions.
  • Maintained detailed inspection logs and NCR reports.
  • EPC Project CNRL-Horizon Oil Sands VDU-DRU and HSU Upgrader Project

Site Inspector

Prism Canada Inc.
Kitchener, ON
09.1999 - 09.2012
  • Ensures that construction activities meet the required quality standards. This includes inspecting materials, monitoring workmanship, conducting tests, and ensuring compliance with project specifications, codes, and safety regulations.
  • BAPS Swaminarayan Temple – Toronto, ON Phase 1-3

Construction Manager

Associated Steel Ltd.
Nairobi, Kenya
04.1994 - 11.1998
  • Working on Ruler area.

Site Agent

Intex Constructions
Nairobi, Kenya
04.1990 - 03.1994
  • Aathi River/Kapsabet Sewer Treatment Project – Kenya

Civil Engineer

Al Dahrani Construction Est.
Manama, Bahrain
01.1984 - 12.1989
  • Multi-story Exclusive High-rise Buildings and Row Houses – Bahrain

Quantity Surveyor

N.M. IMPRESIT CREA
Riyadh, Saudi Arabia
12.1981 - 12.1983
  • Storm Water Project, Riyadh, Saudi Arabia, Pre-cast and Heavy Concrete Sewer Treatment.

Site Engineer

S.M.P.S. Consultants
India
01.1980 - 12.1981
  • Wharf on the Delta of Big River Tapi – KRIBHCO, India
  • Multi-unit in textile industries and Glass Factory

Civil Engineer

Frontier Construction Co.
Mathura, India
11.1977 - 02.1978
  • Oil Refinery Projects-Heavy Vessels Foundations

Site Superintendent

Paramount Constructions
Baroda, India
09.1976 - 11.1977
  • Wastewater Treatment and Raw Water Treatment Plant - Clarifiers, Homogeneous, Aeration Tank, and Water-Tight Structure

Education

Diploma - Civil Engineering

01-1976

Skills

  • Site inspection
  • Project management
  • Scheduling and planning
  • Construction management
  • Work planning
  • Cost estimation
  • Staff management
  • Safety awareness
  • Budget planning
  • Project coordination
  • Estimate preparation
  • Health and safety
  • Cost control
  • Soil testing
  • Concrete technology
  • Technical documentation
  • Civil engineering
  • Mathematics proficiency
  • Technical reporting
  • Project oversight
  • Waste management systems
  • Excellent math skills
  • Value engineering
  • Strategic planning
  • Health and safety regulations
  • Energy efficiency strategies
  • Consulting
  • Blueprint review
  • Pavement design
  • Stormwater management
  • Inspection management
  • Budget control
  • Technical expertise
  • Site maintenance
  • Procurement strategies
  • Risk assessment
  • Cost-benefit analysis
  • Technical presentations
  • Construction quality standards
  • Milestone tracking
  • On-site coordination
  • Site supervision
  • Excavation coordination
  • Site reporting
  • Project administration
  • Integrated project delivery
  • Schedule implementation
  • Site logistics
  • Safety maintenance
  • Microsoft office
  • Quality control
  • Team leadership
  • Analytical problem solving
  • Project estimation
  • Cost estimates
  • Decision-making

Languages

Punjabi
Professional Working

Timeline

Site Engineer

Kusiar Project Services
05.2024 - 11.2025

Quality Inspector

Dragados Canada Inc.
11.2019 - 10.2023

Field Engineer

Tetra Tech Infrastructure and Environment
07.2018 - 07.2019

QA/QC Inspector

Metalcare Group Inc.
11.2014 - 07.2018

Field Engineer

FWS Industrial Project Canada Ltd.
04.2014 - 11.2014

QC Civil Inspector

TR Canada Inc.
10.2012 - 03.2014

Site Inspector

Prism Canada Inc.
09.1999 - 09.2012

Construction Manager

Associated Steel Ltd.
04.1994 - 11.1998

Site Agent

Intex Constructions
04.1990 - 03.1994

Civil Engineer

Al Dahrani Construction Est.
01.1984 - 12.1989

Quantity Surveyor

N.M. IMPRESIT CREA
12.1981 - 12.1983

Site Engineer

S.M.P.S. Consultants
01.1980 - 12.1981

Civil Engineer

Frontier Construction Co.
11.1977 - 02.1978

Site Superintendent

Paramount Constructions
09.1976 - 11.1977

Diploma - Civil Engineering

Anilkumar Jani