Overview
Work History
Education
Skills
License
Certification
Timeline
Generic

Andrew Beck

Thunder Bay,ON

Overview

9
9
years of professional experience
1
1
Certification

Work History

Lead Installation Technician

Fluid Aire Dynamics
10.2021 - 10.2024
  • Planned, designed, installed and performed system startups on heavy industrial air compressor systems and nitrogen systems.
  • Worked with service to perform maintenance on industrial air compressor systems.
  • Project Planning, Coordination and Design developed and managed detailed construction project plans, defining scope, timelines, budgets, and resource allocation to ensure timely and cost-effective project completion.
  • Risk Management, identified and assessed project risks (e.g., delays, safety hazards), developed mitigation plans, and proactively addressed potential issues to keep projects on track and on time.
  • Repaired rotary screw industrial air compressors
  • Performed Rigging service to removed existing and staged new industrial air compressors, air dryers, capacity tanks, high pressure booster, nitrogen generators.
  • Ensured safety compliance, leading to a decrease in workplace accidents during installations.
  • Increased overall efficiency through effective communication with clients and team members.
  • Collaborated with sales teams to provide accurate estimates and timelines for installation projects, improving client relationships.
  • Managed inventory effectively, reduced costs on projects by implementing different designs and materials.
  • Provided exceptional service by troubleshooting issues and resolving them promptly during installations.
  • Established long-term relationships with clients by providing excellent post-installation support services.
  • Reduced installation time with efficient project management and team coordination.
  • Implemented cost-saving measures while maintaining quality standards, ultimately benefiting company profits and reputation.
  • Conducted regular training sessions for technicians to ensure up-to-date knowledge on industry best practices.
  • Maintained high-quality standards, resulting in excellent customer feedback and repeat business.
  • Completed complex installations within tight deadlines, showcasing strong problem-solving abilities and adaptability under pressure.
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Diagnosed and troubleshot system faults, identifying equipment issues and resolutions.
  • Maintained high level of safety when using hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Established and maintained effective working relationships with vendors and contractors to support operations.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete compressor air, high pressure, nitrogen systems setup.

Electrician

Innovative Power Solutions
05.2020 - 08.2021
  • Installed rooftop and ground mount solar systems
  • Operated telehandler "lull" to lift solar panels, electrical equipment and tools onto rooftops where the project is occurring.
  • Collaborated with team to come up with a technique to layout and build the solar panel arrays in a efficient affective way while maintaining good safety protocol.
  • Neatly bundled wiring and did other forms of cable management.
  • Grounded systems to building and earth
  • Wired in solar panels to inverters
  • Exposed to extreme environmental conditions

Electrician

Granite Ledge Electrical
05.2019 - 11.2020
  • Installed traffic signals, street lighting, pedestrian crossing devices and speed monitoring systems
  • Operated line trucks, dump trucks, skid steers, excavators
  • Installed and wired electrical transformers, service panels, traffic signals, circuit breakers and more.
  • Installation of traffic control devices like barriers, cones, and temporary signs to guide motorists safely around work zones or closed down lanes of traffic
  • Worked with high and low voltage systems
  • Exposed to extreme environmental conditions

Electrician

Hunt Electric Corp
06.2017 - 01.2019
  • Worked from ladders, scaffolds and boom/scissor lifts to install electrical lighting fixtures, pipe runs, pull boxes, receptacles in ceilings and on buildings.
  • Bent and built piping layouts with Ridged, IMC, PVC and EMT conduit and piping for outdoor, commercial and industrial applications.
  • Installed and wired ground mounted solar arrays
  • Pulled many different sized wires and groups of wires through cable trays and piping with wenches and pulleys and other means.
  • Built cable tray systems
  • Threaded pipes using piping machines.
  • Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code.
  • Installed and wired fire alarm systems
  • Installed electrical systems for commercial buildings, including wiring, outlets, switches, circuit breakers, lighting rough-in and finish work.
  • Installed and wired electrical transformers, service panels, and circuit breakers and fused disconnects.
  • Operated scissor, aerial and boom lifts
  • Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.
  • Installed 120/208/240/277/480 volt A/C systems.

Electrician

Berd Electric
09.2015 - 05.2017
  • Rough-in boxes, pulled Romex wiring, MC wiring, mounted circuit breaker panels
  • Installed and wired electrical transformers, service panels, and circuit breakers.
  • Wired receptacles in parallel, 240v outlets, GFCIs, cord ends, recess lighting, cabinet lighting, outdoor lighting

Education

K-11 -

North Branch School District
North Branch, MN

GED -

Harmony Learning Center
Maplewood, MN
06-2011

Technical School - 4 Year Electrical Apprenticeship Program

IBEW Apprenticeship Program
St Paul, MN
08-2017

Skills

  • High and low voltage systems
  • Wiring in series and parallel
  • Electrical calculations
  • Electrical Building Code
  • Electrical troubleshooting
  • Security/Emergency systems
  • Excellent at bending any size or kind of conduit
  • Electrical wiring of transformers, motors, panels, switches

License

Minnesota Department of Labor

Registered Unlicensed Electrician

License #: RE714469

Certification

  • OSHA 10 Safety
  • Emergency And Limited Energy Circuits
  • NFPA-70E Construction Safety
  • Overcurrent Protective Devices
  • Harassment Prevention
  • Rigging And Material Handling For Construction
  • MEWP "Aerial Lift" Operator Safety Training. Certified to teach and qualify individuals for operation.
  • Powered Industrial Truck Operator Safety/Training. Certified to teach and qualify individuals for operation.

Timeline

Lead Installation Technician

Fluid Aire Dynamics
10.2021 - 10.2024

Electrician

Innovative Power Solutions
05.2020 - 08.2021

Electrician

Granite Ledge Electrical
05.2019 - 11.2020

Electrician

Hunt Electric Corp
06.2017 - 01.2019

Electrician

Berd Electric
09.2015 - 05.2017

K-11 -

North Branch School District

GED -

Harmony Learning Center

Technical School - 4 Year Electrical Apprenticeship Program

IBEW Apprenticeship Program
Andrew Beck