Summary
Overview
Work History
Education
Skills
Timeline
Generic

Andie Campanilla

San Jose,CA

Summary

Accomplished Maintenance Supervisor with a proven track record at Eden Healthcare, enhancing equipment reliability and staff productivity by over 30%. Expert in preventive maintenance and troubleshooting, coupled with exceptional team leadership and vendor management skills. Prioritizes safety and efficiency, ensuring project completion within deadlines and budget. Dedicated Maintenance Supervisor offering 35+ years of successful team management in maintenance-driven roles. Adept at scheduling facilities maintenance to minimizing downtime and safety hazards. Well-versed in equipment troubleshooting and repair with focus on quality and efficiency. Reliable Maintenance Supervisor offering 35+ years of experience overseeing maintenance and janitorial team tasks. Hardworking and diligent in developing and enforcing adherence to maintenance schedules. Committed to reducing risks and promoting workplace safety through improved safety training. Focused professional knowledgeable about devising innovative solutions to diverse business concerns and goals. Strategic and forward-thinking leader with self-motivated and tactical mindset. Excellent relationship-building and critical thinking skills with determined and decisive nature. Results-driven professional leads, motivates and collaborates with teams of mechanics. Experienced in troubleshooting and diagnosing repair issues. Committed to implementing best practices and standards to deliver customer satisfaction.

Overview

38
38
years of professional experience

Work History

Maintenance Supervisor

Eden Healthcare
08.2023 - Current
  • Coordinated preventative maintenance schedules, verifying equipment safety and function.
  • Streamlined work order processes for increased efficiency in addressing maintenance requests and tracking progress.
  • Supervised [Number] employees and scheduled shifts.
  • Supervised a team of technicians, providing guidance on complex repair tasks and fostering professional development opportunities.
  • Managed inventories of spare parts and tools to ensure the availability of necessary resources for timely repairs.
  • Increased productivity by reducing downtime, budgeting effectively, allocating tasks, and maintaining high standards of safety and work quality.
  • Improved equipment reliability by implementing a preventive maintenance program and scheduling routine inspections.
  • Reduced downtime by quickly diagnosing and repairing issues with machinery, electrical systems, and facility infrastructure.
  • Established and documented protocols for preventive maintenance procedures, decreasing equipment issues, and reducing downtime.
  • Facilitated strong communication between maintenance personnel and other departments to ensure seamless coordination during planned outages or emergency situations.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Enhanced safety standards through regular staff training sessions, hazard assessments, and ensuring compliance with OSHA regulations.
  • Conducted regular performance evaluations of maintenance staff to identify strengths, areas for improvement, and opportunities for growth within the organization.
  • Paid close attention to guidelines, specifications, and detailed instructions to continuously adhere to strict operational and maintenance regulations.
  • Kept track of equipment, inventories, and system upgrades in order to prepare and present detailed reports to upper management.
  • Coordinated scheduled shutdowns for major equipment overhauls, minimizing disruption to production schedules while maximizing asset longevity.
  • Mentored junior technicians through hands-on training, fostering a culture of teamwork and knowledge sharing within the maintenance department.
  • Analyzed and identified equipment failure root causes and initiated correction actions.
  • Observed guidelines, specifications, and detailed instructions to meet strict operational and maintenance regulations.
  • Monitored employee work tasks while installing, aligning, and balancing new equipment for projects.
  • Tracked and managed department costs for good budget adherence.
  • Negotiated contracts with vendors for cost-effective materials procurement.
  • Prioritized preventative measures such as lubrication programs and vibration analysis that helped extend equipment life cycles and reduce overall costs.
  • Collaborated with cross-functional teams to develop budgets for maintenance projects, prioritizing tasks based on urgency and costeffectiveness.
  • Provided guidance to management regarding project bids for onsite improvements.
  • Promoted continuous improvement by encouraging staff to suggest innovative ideas for process enhancements and cost-saving initiatives.
  • Fostered a positive work environment that led to high employee morale and retention rates, while consistently meeting performance expectations.
  • Conducted root cause analysis on recurring equipment failures and implemented corrective actions to prevent future occurrences.
  • Procured pricing information from various vendors to support cost-effective purchasing.
  • Assisted in the planning and execution of facility expansions, ensuring proper installation of new equipment and seamless integration with existing systems.
  • Scheduled and oversaw maintenance, repair and installation activities.
  • Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
  • Utilized proper tools and materials to adhere to safety guidelines.
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
  • Created and maintained daily and weekly reports for upper management.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Managed efficient teams of up to 10 employees.
  • Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
  • Organized ongoing maintenance schedules to boost system performance.
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Contributed to development, implementation, and execution of maintenance programs.
  • Optimized supply levels to keep stock within ideal parameters for expected needs.
  • Monitored product quality and communicated necessary improvements to site superintendent.
  • Efficiently assisted service workers with problematic transactions to maintain customer satisfaction and quickly rectify issues.
  • Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
  • Monitored systems to assure increase in power flow and integrated new system components, fixtures and motors.

Maintenance Supervisor

East Bay Post Acute
06.2017 - 08.2023
  • Coordinated preventative maintenance schedules, verifying equipment safety and function.
  • Streamlined work order processes for increased efficiency in addressing maintenance requests and tracking progress.
  • Supervised [Number] employees and scheduled shifts.
  • Supervised a team of technicians, providing guidance on complex repair tasks and fostering professional development opportunities.
  • Managed inventories of spare parts and tools to ensure the availability of necessary resources for timely repairs.
  • Increased productivity by reducing downtime, budgeting effectively, allocating tasks, and maintaining high standards of safety and work quality.
  • Improved equipment reliability by implementing a preventive maintenance program and scheduling routine inspections.
  • Reduced downtime by quickly diagnosing and repairing issues with machinery, electrical systems, and facility infrastructure.
  • Established and documented protocols for preventive maintenance procedures, decreasing equipment issues, and reducing downtime.
  • Facilitated strong communication between maintenance personnel and other departments to ensure seamless coordination during planned outages or emergency situations.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Enhanced safety standards through regular staff training sessions, hazard assessments, and ensuring compliance with OSHA regulations.
  • Conducted regular performance evaluations of maintenance staff to identify strengths, areas for improvement, and opportunities for growth within the organization.
  • Paid close attention to guidelines, specifications, and detailed instructions to continuously adhere to strict operational and maintenance regulations.
  • Kept track of equipment, inventories, and system upgrades in order to prepare and present detailed reports to upper management.
  • Coordinated scheduled shutdowns for major equipment overhauls, minimizing disruption to production schedules while maximizing asset longevity.
  • Mentored junior technicians through hands-on training, fostering a culture of teamwork and knowledge sharing within the maintenance department.
  • Analyzed and identified equipment failure root causes and initiated correction actions.
  • Observed guidelines, specifications, and detailed instructions to meet strict operational and maintenance regulations.
  • Monitored employee work tasks while installing, aligning, and balancing new equipment for projects.
  • Tracked and managed department costs for good budget adherence.
  • Negotiated contracts with vendors for cost-effective materials procurement.
  • Prioritized preventative measures such as lubrication programs and vibration analysis that helped extend equipment life cycles and reduce overall costs.
  • Collaborated with cross-functional teams to develop budgets for maintenance projects, prioritizing tasks based on urgency and costeffectiveness.
  • Provided guidance to management regarding project bids for onsite improvements.
  • Promoted continuous improvement by encouraging staff to suggest innovative ideas for process enhancements and cost-saving initiatives.
  • Fostered a positive work environment that led to high employee morale and retention rates, while consistently meeting performance expectations.
  • Conducted root cause analysis on recurring equipment failures and implemented corrective actions to prevent future occurrences.
  • Procured pricing information from various vendors to support cost-effective purchasing.
  • Tracked and progressed maintenance requests in CMMS systems to meet schedules.
  • Assisted in the planning and execution of facility expansions, ensuring proper installation of new equipment and seamless integration with existing systems.
  • Implemented energy-saving initiatives by identifying areas for improvement in equipment operation and facility management practices.
  • Scheduled and oversaw maintenance, repair and installation activities.
  • Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
  • Utilized proper tools and materials to adhere to safety guidelines.
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
  • Created and maintained daily and weekly reports for upper management.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
  • Managed efficient teams of up to 8 employees.
  • Organized ongoing maintenance schedules to boost system performance.

Superintendent

Mariner Health Care
07.2012 - 08.2017
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.
  • Managed multiple simultaneous projects while maintaining strict deadlines and adhering to budget constraints.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Collaborated with architects, engineers, and contractors to achieve seamless project execution.
  • Implemented safety protocols for reduced workplace accidents and improved employee wellbeing.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Mentored junior staff, leading to increased productivity and improved teamwork throughout the organization.
  • Maintained safety onsite and upheld all OSHA regulations by [Action].
  • Conducted regular site inspections to maintain compliance with industry regulations and standards.
  • Worked with specialized teams to accomplish all objectives and achieve goals.
  • Enforced rigorous safety procedures during daily operations, creating a safe working environment for all personnel involved in the project''s execution process.
  • Established effective quality control measures for consistent delivery of high-quality construction projects.
  • Scheduled and supervised maintenance and repair of equipment, buildings and grounds.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Analyzed reports to identify areas of improvement and implement corrective action.
  • Evaluated subcontractor performance regularly, ensuring adherence to contract requirements and maintaining accountability throughout the lifecycle of each project.
  • Stepped up during foreman's absence to answer questions and delegate project tasks to employees.
  • Incorporated innovative construction techniques into projects, resulting in improved efficiency and overall quality of workmanship.
  • Optimized resource allocation to minimize delays and maximize project success.
  • Managed 20 workers when performing duties in line with local and national building codes in construction.
  • Developed and maintained productive working relationships with internal and external stakeholders.
  • Monitored budgets and expenditures to maintain fiscal responsibility.
  • Coordinated permit acquisition processes for smooth progress on all construction projects.
  • Enhanced project efficiency by streamlining communication between team members and stakeholders.
  • Developed comprehensive budgets and schedules to ensure timely project completion within allocated resources.
  • Negotiated contracts with vendors, resulting in cost savings and stronger relationships with suppliers.
  • Negotiated contracts with suppliers and vendors to confirm quality and cost effectiveness.
  • Spearheaded efforts in sustainability initiatives, integrating eco-friendly materials and practices into construction projects.
  • Directed projects according to schedule and quality demands.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Provided feedback to workers on job performance and safety procedures.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected equipment and tools used for safe operation.
  • Sourced suppliers and purchased necessary materials for work.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Created and implemented plans to maximize efficiency of workers.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Assisted in recruiting and hiring new construction and extraction workers.
  • Supervised training of new construction and extraction workers on safety practices and procedures.

Construction Worker

MCS System
02.1986 - 03.2012
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Measured dimensions of finished pieces for conformance to specifications.
  • Enhanced project efficiency by coordinating with team members and managing resources effectively.
  • Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
  • Participated in continuous learning initiatives to enhance professional development within the industry, applying new techniques when necessary for optimal results on job sites.
  • Consistently met or exceeded building codes and regulations, resulting in successful inspections upon project completion.
  • Increased safety awareness through conducting regular training sessions for staff and implementing best practices on the job site.
  • Streamlined communication between team members, leading to increased collaboration and problem-solving capabilities.
  • Developed strong relationships with suppliers, negotiating favorable pricing terms that contributed to overall project savings without sacrificing quality materials or service levels.
  • Demonstrated a strong commitment to environmental sustainability through proper waste disposal measures, recycling initiatives, and eco-friendly construction practices when possible.
  • Collaborated with architects and engineers to ensure accurate implementation of design plans while maintaining structural integrity.
  • Mentored junior team members, providing guidance on construction methods and techniques to improve their skillsets over time.
  • Coordinated with external stakeholders, such as local authorities and utility companies, to ensure smooth project progression without unnecessary delays or complications.
  • Assisted in the preparation of accurate project bids by providing detailed estimates for labor, materials, and equipment costs based on historical data and industry benchmarks.
  • Assisted in budget management by monitoring expenses and identifying cost-saving opportunities without compromising quality or safety standards.
  • Used variety of hand and power tools to complete tasks.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Installed drywall, siding and other structural components.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Followed instructions and safety protocols while operating machinery and equipment.

Education

High School Diploma -

Silver Creek High School
San Jose, CA
06.1988

Skills

  • Team Supervision
  • Facilities Maintenance
  • Work Order Management
  • Repairs
  • Grounds Maintenance
  • Staff Management
  • Deadline Management
  • Employee Scheduling
  • Skilled Maintenance and Repair
  • Tools and Equipment Maintenance
  • Equipment Operation
  • Professional Communication
  • OSHA Compliance
  • Analytical and Critical Thinking
  • Relationship Building
  • Quality Assurance

Timeline

Maintenance Supervisor

Eden Healthcare
08.2023 - Current

Maintenance Supervisor

East Bay Post Acute
06.2017 - 08.2023

Superintendent

Mariner Health Care
07.2012 - 08.2017

Construction Worker

MCS System
02.1986 - 03.2012

High School Diploma -

Silver Creek High School
Andie Campanilla