Electrical professional with seven years of experience with Instrumentation and Controls and Power Utility industry focused on Industrial electrical testing, commissioning and power distribution designing. Possess strong technical capabilities and aptitude in the areas of electrical engineering, computer-aided engineering, and electrical systems. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals by utilizing knowledge and skills in planning and designing power utility system.
• Experienced for 12KV/25KV voltage levels at 60Hz for single to three phase power load distribution planning and designing for capital projects focusing at commercial, apartment buildings, warehousing, farm production, agricultural sectors.
• Performed power load calculations following BC Hydro distribution electrical and civil codes and standards for projects.
• Reviewed engineering studies with BC Hydro distribution engineers for acceptable primary and secondary fuse size, phase balancing, transformer and conductor size, and voltage drop calculations.
• Traveled to proposed construction area locations to meet with multiple stakeholders to discuss any occurring design or site conflicts related to environment, wildlife, clearances after client issued proposed civil and electrical engineering drawings. Site areas included urban, sub-urban, rural, and remote areas.
• Organized multiple projects at same time by developing plan of work for each site so each project can finish on time. Created each project's timeline and to-do list using Microsoft Outlook and Primavera P6 to avoid missing important scope of design work.
• Maintained regular contact using phone call or email with clients and stakeholders to provide task completion updates or any design related complications.
• Drafted customer supplied electrical and civil drawings using AUTOCAD and BC Hydro GIS software to present utility proposal. Included safety instruction stamps and standards for contractors.
• Prepared total project cost estimates including direct and indirect costs, Contingency and inflation. Reported capital project costs to senior management.
• Awarded Safe Work Appreciation Award for following BC hydro design and government regulated safety standards.