Summary
Overview
Work History
Education
Skills
Languages
Certification
References
Timeline
Generic
Alex Gutierrez

Alex Gutierrez

Huntington Beach

Summary

Responsible for the day-to-day maintenance of the project information flow.

  • Duties include the review and submittal of shop drawings, initiation and coordination of the request for information logs, review and documentation of contract drawing changes, the preparation of job closeout records and warranties, and managing the quality control program.
  • Responsible for managing the contract change work and cost control.
  • Documented contract drawing changes to maintain up-to-date project records.
  • Prepared job closeout records and warranties to finalize project documentation.
  • Assisted in the quality control program to uphold standards throughout project lifecycle.

Overview

2026
2026
years of professional experience
1
1
Certification

Work History

NoHo County Health Center & Parking Structure

LA County
North Hollywood
- Current

North Hollywood County Health Center & Parking Structure
Construction of a new 51,308 sq. Ft. Non-licensed outpatient health center building to serve the department of mental health (DMH), department of public health (DPH), and department of health services (DHS) and construction of an adjacent 5-story parking structure.

Kaiser Baldwin Park ED Expansion Baldwin Park

Kaiser Permanente
Baldwin Park

The project consists of the Kaiser Permanente Baldwin Park (KPBP) Medical center expansion of the emergency department (ED) from 38 To 57 treatment bays (50 new treatment rooms and 7 existing treatment Rooms to remain). These bays are non-licensed beds. The project scope Includes a new adjacent building and canopy addition to the Baldwin Park hospital and tenant improvements within the existing emergency department which is located on the first floor of the hospital building.

Kaiser Baldwin Park AHU 8-14

Kaiser Permanente
Baldwin Park

The acute care hospital’s existing Air Handling Units (AHU) are over
24 years old and do not meet current code requirements for humidity
and mixed air control. The scope of work includes fabrication and
installation of redundant AHU-7B; duct cleaning and sealing of AHU-8
through AHU-14; and fabrication and replacement of AHU-8 through
AHU-14 and the associated VAV boxes. Work took place within
Operating Rooms during both day and night shifts.

Dignity Health Mercy Southwest Patient Tower

Dignity Health
Bakersfield

Dignity Health Mercy Southwest Patient Tower, Bakersfield, CA

New tower project to include a 5-story approximately 143,000-square-foot new acute care building, containing 106 beds, a mix of NICU bays, ICU Beds, and Med Surg. Project and central plant to support the Tower. This project also includes approximately 32,000-square feet of remodel space which contains surgery suites, imaging, and ED bays.

Huntington Hospital Seismic Retrofit, Pasadena, CA

Huntington Memorial Hospital
Pasadena

Huntington Hospital Seismic Retrofit, Pasadena, CA

Executed 4D seismic retrofit for Wingate-Hahn building in occupied hospital, integrating new concrete footings, shear walls, fiber wrap, steel drag elements, and steel jacketing at columns to enhance structural integrity and safety.

ED Expansion, Urgent Care Addition

Providence Saint Joseph Medical Center
Burbank

Providence St. Joseph Burbank ED Expansion, Urgent Care Addition, and Site Utility Relocation, Burbank, CA

Working on an operational hospital campus, an expansion is being made to the existing Emergency Department (ED) and separate addition is being made to create a new Urgent Care Department (UCD). The ED is expanded from 13,800 square feet to 35,500 square feet, while the UCD adds an additional 11,000 square feet. Significant soil improvement measures include a combination of 40' underground stone columns and injecting concrete deep soil mixing. Extensive site utility rerouting or relocation is upgrading all main infrastructure feeds and adding new 12Kw power to the active operational campus.

CSULB TOCA - Microbiology HVAC Upgrade

CSULB
Long Beach

The scope of work on this project consisted of replacing the existing
HVAC system in the Microbiology Building. The fan coil units that were
located along the external walkways were beyond their lifetime and
no longer energy efficient. The units at each level were replaced with
new units. The heating and chilled water piping were also replaced.
Other improvements included painting the building exterior walls and
handrails and replacing the exterior fascia.

Education

B.S. - Construction Management

California State University of Long Beach
Long Beach, CA
12-2020

Skills

  • Construction documentation
  • Project closeout
  • Scope definition
  • Training and mentoring
  • RFI documentation
  • Specification review
  • Documentation control
  • Project scope and requirements
  • Team collaboration and leadership
  • Subcontractor oversight
  • Quality control

Languages

Spanish
Native/ Bilingual

Certification

OSHA 30

References

References available upon request.

Timeline

NoHo County Health Center & Parking Structure

LA County
- Current

Kaiser Baldwin Park ED Expansion Baldwin Park

Kaiser Permanente

Kaiser Baldwin Park AHU 8-14

Kaiser Permanente

Dignity Health Mercy Southwest Patient Tower

Dignity Health

Huntington Hospital Seismic Retrofit, Pasadena, CA

Huntington Memorial Hospital

ED Expansion, Urgent Care Addition

Providence Saint Joseph Medical Center

CSULB TOCA - Microbiology HVAC Upgrade

CSULB

B.S. - Construction Management

California State University of Long Beach
Alex Gutierrez