Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Albert Ruiz

Oxnard

Summary

Dynamic and detail-oriented Installer/Fabricator with a proven track record at Riviera Bronze, excelling in equipment installation and troubleshooting. Demonstrates strong problem-solving abilities and safety awareness, ensuring projects are completed efficiently. Skilled in power tool operation and team collaboration, consistently delivering high-quality results in fast-paced environments.

Overview

3
3
years of professional experience

Work History

Installer/Fabricator

Riviera Bronze
Ventura, CA
02.2024 - 02.2026
  • Installed equipment and systems according to specifications and safety standards.
  • Collaborated with team members to complete installation projects efficiently.
  • Operated hand tools and power tools with attention to safety protocols.
  • Assisted in troubleshooting issues during installation processes for optimal performance.
  • Laid out materials and system components to prepare for installation.
  • Installed complete systems at new residential and business construction sites.

General Laborer

Partners Personel
Oxnard, CA
04.2023 - 06.2023
  • Collaborated with team members to complete projects on schedule.
  • Adapted quickly to changing tasks and priorities within the team.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Assisted in inventory management by accurately labeling and organizing products for easy accessibility.
  • build and install
  • forklift operated

Concrete Laborer

CAL-PIA
Camarillo, CA
01.2023 - 04.2023
  • Operated concrete mixing tools and machinery to ensure proper material consistency.
  • Assisted in formwork installation and removal for various concrete structures.
  • Collaborated with team members to adhere to safety standards on job sites.
  • Mixed and poured concrete according to specifications for residential projects.

Education

High School Diploma -

Providence High School
Oxnard, CA
01-2019

Skills

  • Attention to detail
  • Time management
  • Positive attitude
  • Power tool operation
  • Equipment installation
  • Pre-installation site prep
  • Worksite preparation
  • Construction management
  • Equipment Repair
  • Welding skills
  • Safety awareness
  • Concrete finishing
  • Forklift operation
  • Supply management
  • Heavy lifting
  • Problem-solving
  • Team collaboration
  • Organization
  • Hand and power tools
  • Demolition work
  • Concrete mixing
  • Bilingual

Languages

English
Full Professional

Timeline

Installer/Fabricator

Riviera Bronze
02.2024 - 02.2026

General Laborer

Partners Personel
04.2023 - 06.2023

Concrete Laborer

CAL-PIA
01.2023 - 04.2023

High School Diploma -

Providence High School
Albert Ruiz