Summary
Overview
Work History
Education
Skills
Timeline
Generic

ADIB AHSAN

Data Analyst
Oakville,ON

Summary

Dedicated Data Analyst with a Mechanical Engineering background and a wealth of experience in data analytics using Spreadsheet, PowerBi, and Tableau, project management, and quality assurance. Proficient in Oracle Agile PLM and skilled in managing product lifecycles, BOM creation, and engineering change orders. Adept at data integrity and accuracy, with a strong track record of process improvement. Effective communicator, leader, and problem solver.

Overview

6
6
years of professional experience

Work History

Master Data Specialist

Estee Lauder Companies
Markham, Ontario
11.2022 - Current
  • Manage day-to-day PLM activities, including Part Number, ECO, MCO, and BOM releases.
  • Created and maintained live dashboards to monitor Inspection Time and individual performance.
  • Developed Metric Charts for packing analysts, providing real-time performance data.
  • Established a monthly dashboard for batch review records, improving data accuracy and efficiency.
  • Automated the Annual Product Review Dashboard, saving time and resources.
  • Designed a Product Review Dashboard, combining production data, lab tests, customer complaints, and partner feedback.
  • Implemented a Gemba Walk Dashboard for visualizing audit data and addressing issues proactively.
  • Generated Ship-To Reports for global recalls, tracking stock location and shipments.
  • Authored SOPs for Mass Complaints, Component Complaints, and Raw Material Complaints for Ship-To Reports.
  • Conducted extensive analysis of rework data from the past 4 years, providing valuable insights and narrative reports for process improvement.
  • Collaborated with cross-functional teams to achieve PLM-related goals. - Ensured SLA compliance in managing tasks and change notices.

Quality Engineer

Integra Lifesciences
Scarborough, ON
07.2022 - 10.2022
  • Lead in the identification and implementation of CAPA.
  • Lead Control of Nonconforming Product process activities (e.g., MRB review/approval).
  • Facilitate the execution of Risk Management activities.
    Support new product development and production (e.g., Change Control implementation activities).
  • Provides support necessary for supplier controls, including but not limited to, supplier audits when necessary.
  • Support validation activities for new and existing products, process and equipment and identify statistically based sampling plans for inspections
    and validations.
  • Implement SPC control system with Manufacturing and Quality Control.
  • Establish and maintain Quality Management System procedures related to areas of responsibilities.
  • Ensure compliance with cGMP, QSR, IS0 13485, MOD/EU MOR, and other applicable regulations/ standards.
  • Participate in FDA inspections, ISO Certification and surveillance audits and customer audits.
  • Identify and implement opportunities for continuous improvement.
  • Collection and reporting of metrics and data as required.

Quality Engineer

Baylis Medical
Mississauga, ON
12.2019 - 06.2022
  • Reviewed outputs from manufacturing records and inspections such as component testing via hardness testing, load testing, leak test and similar to ensure compliance and durability for 2 product lines
  • Reviewed dimensional inspection reports and documentation with using from GD&T knowledge while following ISO 13485:2003, and IPC compliant quality standards
  • Performed statistical analysis of data on spreadsheet as well as data cleaning and sorting using SQL, Python and R Data presented to the mean using data visualization in Excel and Power Bi regarding daily metrics and performance of the department
  • Reviewed and assigned appropriate disposition actions based on root cause analysis
  • Reviewed manufacturing documents such as instructions, protocols, test methods, process changes and deviations Used Solidworks to design and print new CAD models to use as fixtures for SPC (Statistical Process Controls)
  • Provided PM team and stakeholder groups with timely updates regarding project progress and milestones using Microsoft Visio, and eQMS (Quality Management System)
  • Performed process capability analysis, to validate manufacturing and product testing criteria for up to 6 different product lines with ISO 13485 requirements (IQ,PQ,OQ) as well as statistical process controls (SPC)
  • Ensured all health and safety, and lean manufacturing, 5S system are followed for safe working environment

Energy Efficiency Engineer

Renteknik Group
Burlington, ON
05.2019 - 07.2019
  • Successfully conducted meetings with clients for projects' scope of work Created Project Outline with Deliverable as desired by Stakeholders
  • Drafted CAD on building envelop successfully to help with solutions to optimize power usage
  • Developed and delivered engineering analysis reports for technical consultation of clients
  • Successfully installed, removed, and maintained equipment of Biosrcub (using an organic method to clean HVAC/Air Handling Units) in 5 projects
  • Used Python and SQL to perform Data Analysis from databases of clients using NumPy, SciPy, Panda, Matplotlib, MySQL, Microsoft Access, Microsoft Excel, and PostgreSQL
  • Used RETscreen to predict savings for residential, or industrial infrastructures
  • Successfully interacted with external Clients, and met expectations upon Project delivery Shared findings of Data Analysis using Data Visualization software such as Tableau, PowerBi, and Microsoft Excel

Project Engineer

Civica Infrastructure
Maple, ON
01.2019 - 05.2019
  • Assisted the Project Manager in initiating the project by identifying project scope, goal, and deliverable, measuring the success of the project, identifying stakeholders
  • Worked on the Project Charter to visually represent the objectives, how it will be carried out, and who the stakeholders are
  • Worked on progress reports of projects for communication with the stakeholders
  • Organized and assigned work to a task force of 12 people for day to day duties of the project
  • Demonstrated equipment handling to the team, confirming tasks are completed with safety and quality
  • Performed quality assurance and quality control on the data collected

Field Service Engineer - Team Lead

Civica Infrastructure
Maple, ON
04.2018 - 12.2018
  • Installed, removed, and calibrated Data loggers, Weirs, Flumes, and various Sensors
  • Conducted Dye and Fog testing, Flow monitoring, CCTV monitoring, Lot inspections, and GIS
  • Led and supported a team of seven members in relation to all job-related tasks

Education

Bachelor of Applied Science - Mechanical Engineering

University of Ontario Institute of Technology
Oshawa, ON

Certificate - Lean Six Sigma Black Belt

NICBBO Management & Strategy Institute
05.2001 -

Certificate - Google Data Analytics Specialization

Coursera
05.2001 -

Certificate - Excel Skills For Data Analytics And Visualization

Macquire University
05.2001 -

Certificate - Data Analysis With Python

IBM
05.2001 -

Skills

Design & Drawings: SolidWorks, UG NX, Rhino, AutoCAD, MicroStation, Civil 3D, and Autodesk Microsoft Office Suite: Outlook, Word, Excel, PowerPoint, Access, Project, Visioundefined

Timeline

Master Data Specialist

Estee Lauder Companies
11.2022 - Current

Quality Engineer

Integra Lifesciences
07.2022 - 10.2022

Quality Engineer

Baylis Medical
12.2019 - 06.2022

Energy Efficiency Engineer

Renteknik Group
05.2019 - 07.2019

Project Engineer

Civica Infrastructure
01.2019 - 05.2019

Field Service Engineer - Team Lead

Civica Infrastructure
04.2018 - 12.2018

Certificate - Lean Six Sigma Black Belt

NICBBO Management & Strategy Institute
05.2001 -

Certificate - Google Data Analytics Specialization

Coursera
05.2001 -

Certificate - Excel Skills For Data Analytics And Visualization

Macquire University
05.2001 -

Certificate - Data Analysis With Python

IBM
05.2001 -

Bachelor of Applied Science - Mechanical Engineering

University of Ontario Institute of Technology
ADIB AHSANData Analyst