Summary
Overview
Work History
Education
Skills
Affiliations
Career Achievement
Primary Skill
Personal Information
Hobbies and Interests
References
Career Exploit
Career Efficiency
Timeline
Generic

Adewale Sylvester Alewi

Scarborough,Canada

Summary

To be part of dynamic organization and become successful professional by leveraging my engineering skills and to be the best solution provider to every engineering challenge in home and abroad. To provide a suitable environment and community through product and services rendered in truth and faithfulness to achieve organizational goal and target.

Overview

15
15
years of professional experience

Work History

Assistant Project Manager

AVALON INTERCONTINENTAL LIMITED
Lagos, Nigeria
05.2022 - Current
  • Construction of NIMASA Search and Rescue Base Clinic, Apapa, Lagos State
  • Revamp of Nigeria Port Authority Admin Building, Apapa Lagos
  • Construction of NIMASA Vocational Centre, Apapa, Lagos
  • Develop, update, and maintain drawings and specifications.
  • Design and create detailed engineering calculations for HVAC systems, plumbing fixtures, and plumbing devices.
  • Research, identify, and resolve engineering problems.
  • Independently evaluate, organize and priorities work which is normally subject to internal checking and approval.
  • Perform technical tasks assigned by the Project Manager, related with design, verification, or study activities.
  • Interface with other Project Specialists and Engineer.
  • Co-ordinate technical activities performed inside or outside the Company.
  • Completion of conceptual scopes of work and preliminary designs.
  • Checks and coordinates all ongoing and completed work performed by CAD Designers.
  • Review and management of project and general specifications, engineering procedures and engineering policy.

Project Engineer (Mechanical)

LAMBERT ELECTROMEC COMPANY
Lagos, Nigeria
10.2014 - 05.2022
  • Gen. TY Danjuma Villa, Banana Island, Lagos State
  • Project: Eko Pearl Tower in Eko Atlantic, Eko Tower
  • Victoria Island Lagos, Desiderata in Banana Island, Lagos
  • Novare Gateway Mall, (Shoprite), Airport Road, Abuja, FCT
  • Novare Central Office Park Project (Shoprite), Wuse Abuja FCT
  • Material selection; Accessories breakdown, preparation of material take-off and material submittal for various projects.
  • Site Inspection, Monitoring and Supervision of various mechanical service installations.
  • Documentation and reporting of progress of work and forecasting.
  • Technical support in project bidding /tendering and post contract management of projects.
  • Preparation of RFQs (Request for Quotation), MSR (Material Supply Request), RFI (Request for Information), Closing Out Document and O & M Manual.
  • Mechanical As-Built drawing preparation.
  • Liaising with the Safety Officer in the preparation of JSA (Job Safety Analysis).
  • Liaising with the Planning Officer in the preparation of PWO (Program of Work).
  • Liaising with Contractors, Procurement Department and Site Engineers for proper site installation of services.
  • Water supply, drainage, chilled water piping, ducting, rainwater & condensate pipe sizing.

Mechanical Engineer

VINEYARD DESIGN LIMITED, CHURCHGATE GROUP
Lagos, Nigeria
10.2012 - 01.2014
  • Project: 20-Flats, 5-Story Building in Victoria Island, Lagos State
  • Installation of Mechanical and Plumbing works (Firefighting System, A/C System, Plumbing Water Supply, Drainage, Furniture works).
  • Supervising of Mechanical Sub-Contractors.
  • Planning and of Work distribution for Mechanical teams.
  • Co-ordination with Project Manager, Civil & Electrical Engineer, Building Engineer, Architect and QS.
  • Planning of Materials, Mechanical, Contractor material checking & Mechanical work and ensuring Quality checking.
  • Bills checking of Mechanical Contractor and Mechanical material supplier.
  • Checking of Mechanical and Electrical drawing & tender copy.

Facility Engineer

SEG-MAHSEN & CO (NIGERIA) LIMITED
Lagos, Nigeria
10.2010 - 09.2012
  • Coordinate with the Facility manager to manage the activities and events, and operation of the facility.
  • Plan, direct, coordinate and estimate budget for the facility.
  • Monitor facility usage, operations, and equipment maintenance.
  • Initiate interventions to solve problems in facilities.
  • Develop schedule for regular evaluation of facilities.
  • Participate in development of policies and procedures affecting usage supplies and facilities.
  • Maintain accurate records of equipment functioning status and other systems in building.
  • Prepare and implement annual budget for building use and facility maintenance.
  • Ensure all equipment and other facilities are functioning well.
  • Develop monitoring systems/programs in institution to detect problems in initial stage.
  • Develop and execute system for regular cleaning, repair, and maintenance of facilities.

Education

Certified Project Manager -

International Institutes of Project Manager Professionals (IIPMP)
01.2025

Diploma - Project Management Tech

Scholars International Institutes of Technology
01.2024

B.Eng. - Mechanical Engineering

University of Ilorin, Ilorin, Nigeria
Ilorin, Nigeria
05.2008

Diploma - Computer Science

BBC Computer College
Akure, Nigeria
12.2001

O'Level - WASSCE

West Africa Examination Council
06.2001

PGD - Information Technology

National Open University, Nigeria

Skills

  • Proficiency in using AutoCAD
  • Advanced use of Microsoft Office
  • Advanced use of Corel Draw
  • Microsoft Project Management

Affiliations

  • Council for the Regulation of Engineering in Nigeria (COREN), 2021
  • Nigeria Society of Engineers (NSE), 2021
  • Nigeria Institute of Mechanical Engineers (NIMECHE), 2023
  • International Association of Project Managers Nigeria Network (IAPMN), 2024
  • International Institutes of Project Manager Professionals (IIPMP), 2025

Career Achievement

  • Project: Completion Construction of NIMASA Search and Rescue Base Clinic, Apapa, Lagos State
  • Mckinsey Company Office Fit Out, Heritage Place, Ikoyi, Lagos State.
  • British Petroleum Office fit Out, Heritage Place, Ikoyi, Lagos State.
  • Equinor Office fit out Heritage Place, Ikoyi, Lagos State.
  • Project: Completion of Novare Central Office Park (Shoprite), Wuse, Abuja FCT
  • Project: Completion of Novare Gateway Mall (Shoprite), Airport Road, Abuja FCT
  • Project: 50% Completion Desiderata Mall, Banana Island, Lagos State.
  • Project: Completion of Eko Pearl Tower A, Eko Atlantic City, Lagos.
  • Project: 90% Completion of 20-Flats, 5-Story Building in Victoria Island, Lagos State.
  • Vineyard Design Limited, Churchgate Group, Lagos State.

Primary Skill

Mechanical Engineering

Personal Information

  • Date of Birth: 11/21/81
  • Nationality: Nigerian
  • Marital Status: Married

Hobbies and Interests

  • Reading
  • Meditation
  • Sport & Playing Games
  • Traveling

References

To be provided on Request

Career Exploit

  • Avalon Intercontinental Limited, Lagos, Lagos, Assistant Project Manager, 05/01/22, Present, Construction of NIMASA Search and Rescue Base Clinic, Apapa, Lagos State, Revamp of Nigeria Port Authority Admin Building, Apapa, Lagos, Construction of NIMASA Vocational Centre, Apapa, Lagos, Develop, update, and maintain drawings and specifications., Design and create detailed engineering calculations for HVAC systems, plumbing fixtures, and plumbing devices., Research, identify, and resolve engineering problems., Independently evaluate, organize and priorities work which is normally subject to internal checking and approval., Perform technical tasks assigned by the Project Manager, related with design, verification, or study activities., Interface with other Project Specialists and Engineer., Co-ordinate technical activities performed inside or outside the Company., Completion of conceptual scopes of work and preliminary designs., Checks and coordinates all ongoing and completed work performed by CAD Designers., Review and management of project and general specifications, engineering procedures and engineering policy.
  • Lambert Electromec Company, Lagos, Lagos, Project Engineer (Mechanical), 10/01/14, 05/01/22, Gen. TY Danjuma Villa, Banana Island, Lagos State, Eko Pearl Tower, Eko Atlantic, Eko Tower, Victoria Island Lagos, Desiderata, Banana Island, Lagos, Novare Gateway Mall (Shoprite), Airport Road, Abuja, FCT, Novare Central Office Park Project (Shoprite), Wuse, Abuja, FCT, Material selection; Accessories breakdown, preparation of material take-off and material submittal for various projects., Site Inspection, Monitoring and Supervision of various mechanical service installations., Documentation and reporting of progress of work and forecasting., Technical support in project bidding/tendering and post contract management of projects., Preparation of RFQs (Request for Quotation), MSR (Material Supply Request), RFI (Request for Information), Closing Out Document and O & M Manual., Mechanical As-Built drawing preparation., Liaising with the Safety Officer in the preparation of JSA (Job Safety Analysis)., Liaising with the Planning Officer in the preparation of PWO (Program of Work)., Liaising with Contractors, Procurement Department and Site Engineers for proper site installation of services., Water supply, drainage, chilled water piping, ducting, rainwater & condensate pipe sizing.
  • Vineyard Design Limited, Churchgate Group, Lagos, Lagos, Mechanical Engineer, 10/01/12, 12/31/14, 20-Flats, 5-Story Building, Victoria Island, Lagos State, Installation of Mechanical and Plumbing works (Firefighting System, A/C System, Plumbing Water Supply, Drainage, Furniture works)., Supervising of Mechanical Sub-Contractors., Planning and of Work distribution for Mechanical teams., Co-ordination with Project Manager, Civil & Electrical Engineer, Building Engineer, Architect and QS., Planning of Materials, Mechanical, Contractor material checking & Mechanical work and ensuring Quality checking., Bills checking of Mechanical Contractor and Mechanical material supplier., Checking of Mechanical and Electrical drawing & tender copy.
  • Seg-Mahsen & Co (Nigeria) Limited, Lagos, Lagos, Facility Engineer, 10/01/10, 09/30/12, Coordinate with the Facility manager to manage the activities and events, and operation of the facility., Plan, direct, coordinate and estimate budget for the facility., Monitor facility usage, operations, and equipment maintenance., Initiate interventions to solve problems in facilities., Develop schedule for regular evaluation of facilities., Participate in development of policies and procedures affecting usage supplies and facilities., Maintain accurate records of equipment functioning status and other systems in building., Prepare and implement annual budget for building use and facility maintenance., Ensure all equipment and other facilities are functioning well., Develop monitoring systems/programs in institution to detect problems in initial stage., Develop and execute system for regular cleaning, repair, and maintenance of facilities.

Career Efficiency

Having Over 14 years experience at various positions includes facility management, site coordination, project designing, quantity surveying, quality control and quality assurance, project planning and execution. Excellent project management skills. Study operational problems and recommend changes. Coordinating on the contract process and procedures, follow up with the client officials in relation to all pretender/post-tender operations. Provide technical inputs in the projects, project coordination, client management, and support to the existing projects, business development. High-rise building, equipment maintenance and installation (Fire Protection System, Plumbing and HVAC System). Design working drawing for project take-off and evaluate the progress report of work to project manager for assessments and follow up. Technical skills whilst also making effective technical contribution at a higher level. Engineering support for the design team to ensure meeting the contract requirements. Diligently follow safety and security procedures; use equipment and materials properly. Excellent communications skills in working with other disciplines, clients, and outside agencies.

Timeline

Assistant Project Manager

AVALON INTERCONTINENTAL LIMITED
05.2022 - Current

Project Engineer (Mechanical)

LAMBERT ELECTROMEC COMPANY
10.2014 - 05.2022

Mechanical Engineer

VINEYARD DESIGN LIMITED, CHURCHGATE GROUP
10.2012 - 01.2014

Facility Engineer

SEG-MAHSEN & CO (NIGERIA) LIMITED
10.2010 - 09.2012

Certified Project Manager -

International Institutes of Project Manager Professionals (IIPMP)

Diploma - Project Management Tech

Scholars International Institutes of Technology

B.Eng. - Mechanical Engineering

University of Ilorin, Ilorin, Nigeria

Diploma - Computer Science

BBC Computer College

O'Level - WASSCE

West Africa Examination Council

PGD - Information Technology

National Open University, Nigeria
Adewale Sylvester Alewi