Dedicated construction professional with experience in budget tracking, logistics management and team supervision. Highly organized and accomplished in project planning, scheduling and daily crew oversight. Experienced in providing training and guidance to ensure quality and timely project completion. Diligent professional with extensive experience in the construction industry. Proven success in managing projects from conception to completion, ensuring projects are delivered on time and within budget. Demonstrated ability to lead and motivate cross-functional teams and to handle multi-million dollar projects. Experienced in developing and implementing safety protocols.
Initial dialogue with Contractor and engineering terms for Project Requirements as per NATM method.
View design of significant structure including Broad gauge Railway tunnel, Minor bridges and Culverts.
Review RFI prepared by contractor with the proper chainage and alignment
Enforce change in support class as per rock Quality for on site safety.
Ensures that construction plan align with regularity standards and Tunneling code throughout my whole tenure.
Oversee soil and rock Quality assessment, implementing Protocols for site remediation as necessary.
Providing justice to the role of site supervisor, ensuring effective oversight of construction activities.
Overall responsibility of preparing and maintaining QA/QC as per approved mix design
Coordinate with consultant, getting signature of consultant on reports without delay.
Internal correspondence at site, responsible for sending samples for Third party testing.
Preparing Daily/Weekly/Monthly reports, ensuring frequency of sampling
Ensuring field test like Pullout test of rock bolts, Rebound of shotcreet, Shotcreet Field Suitability Test, Field density test, in-situ core drilling(when required).
Ensuring all testing in laboratory and tunnel site as per approved Inspection and Test Plan.
Monitoring batching plant Productivity, Concrete delivery, mix design and checking quality of raw material.
Supervise tunnel excavation using method like New Austrian Method Of tunneling (NATM)
Monitor tunnel stability and implement necessary Shotcreting, rock bolting, and Grouting.
Ensure smooth coordination between excavation, lining, and finishing work.
Implement safety Protocols to protect workers from cav-ing, gas leaks and water seepage.
Supervise material testing for tunnel lining, shotcreet, and support structure.
Mitigate environmental impact, including dust control, waste disposal.
Manage Project timeline, budget, and resource allocation.
Auto cad
Microsoft Office
Autocad
Civil 3D
Microsoft office
Primavera
In learning new software
Becoming more fit for long hours shift