Dynamic Project Manager and Engineer with over 8 years of experience in leading civil engineering projects across brownfield and greenfield sectors, including oil and gas, mining, and infrastructure. Proven expertise in managing project delivery from initial concept selection to detailed engineering, with a strong focus on pipelines, highway design, site grading, and utility installations. Recognized for driving project timelines and ensuring quality outcomes through strategic planning and execution while fostering collaboration within teams to achieve client satisfaction. Committed to implementing efficient processes that consistently meet or exceed project goals in diverse environments.
Water Growth Unit
Low Carbon Fuels Strategy Implementation
Mildred Lake Mine Expansion - East (~$1.5B TIC)
Project Engineer / Civil Engineer - Suncor Energy Inc. - Alberta Canada
Value engineering, DBM, Pre-FEED, FEED & Detail Engineering for the MLX-E Project which includes over 70km of fibre optic lines, 24km of overhead High-Voltage power lines, 5km of public highway, 2 lane ultra class 9.5km haul road, 2 lane ultra class haul road underpass bridges and over 300 underground road crossings and over 25km of pipeline installation.
Mildred Lake Expansion - West Utilities (~$100M TIC)
Lead Civil Engineer - Syncrude Energy Limited - Alberta Canada
Stage 3 Optimization for the Mildred Lake Expansion Project – West Utilities Scope. This project included the preparation of alternatives for the 72kV Powerline corridor with consideration to future mine plans and future infrastructure that is to be installed.
AN Corridor Relocate to W1 Project (~$70.0M TIC)
Lead Civil Engineer - Syncrude Energy Limited - Alberta Canada
FEED, Detail Engineering, and Construction Support for the Aurora North Corridor Relocation which includes the Geometric design of the 4 km Aurora Highway, relocation of the 30" Intersite Water pipeline, 36" Froth pipeline & 14" Natural Gas pipeline and 4km of 260kV highvoltage
Intersite Water Pipeline Replacement (~$90.0M TIC)
Lead Civil Engineer - Syncrude Energy Limited - Alberta Canada
Stage 2 Development, FEED & Detail Engineering for the replacement of 9.5km of the 30” Intersite Water line. The replacement scope included 12 road crossings including haul road crossing, Highway 63 crossing, ditch crossings, and Mildred Lake Settling Basin (MLSB) dam crest crossing.
Tailings Relocation to NMSP (~$100.0M TIC)
Lead Civil Engineer - Syncrude Energy Limited - Alberta Canada
OPTI, FEED, Detail Engineering and Construction Support for the Tailings Relocation to NMSP project which includes ~7km of a multi-line slurry piping corridor, access road, discharge ramps, three pumphouses, 72kV substation ~1.5km of the powerline.
Firewater System Replacement Project (FWSR) Phase 1 (~$300M TIC)
Lead Civil Engineer - Syncrude Energy Limited - Alberta Canada
OPTI, Detail Engineering and Construction Support for the FWSR Project which includes the demolition, abandonment, and replacement phase 1 of the overall FWSR program including 52km of piping and ~700 appurtenances across the site in brownfield conditions along with the installation of new pumphouses.
Road Crossings Program
Civil Engineer - Syncrude Energy Limited - Alberta Canada
Detail Engineering and Construction Support for the Plant 21 Interconnecting piping system road crossings program. As part of this program, all underground road crossings within the plant battery limits were to be assessed and replaced. This is a site-wide program that included a broad range of brownfield challenges to the team.