Work History
Timeline
Generic

Your Name

MB

Work History

Framer

HAF Contruction
  • Examined wood, work areas, and supplies for defects and damage before completing projects.
  • Cut and joined wood, using precise measurements and proper techniques to create frames of different sizes
  • Used appropriate glues, adhesives and sealants for frames, correctly handling chemicals to minimize exposure.
  • Cut, measured and shaped wood after inspecting blueprints, build areas and work orders.
  • Followed safety protocols when using nail guns, saws, and grinders.
  • Installed frames and secured to walls and support structures.
  • Hung variety of frames with precision and accuracy.
  • Disassembled frames for repair, refurbishment, or replacement.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Measured, cut and installed drywall, paneling and other materials.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Inspected buildings to identify repair needs.
  • Repaired damaged doors, windows and other structures.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Installed valves, hangers, supports, and flanges inside piping systems.
  • Filled pipe systems with water and air to determine location of leaks.
  • Independently worked on projects, while offering process coordination and cooperation with other teams.
  • Complied with state plumbing codes throughout duration of each project.
  • Read blueprints to determine appropriate materials and procedures for each project.
  • Measured, threaded, and cut materials to correct angles.
  • Stored and maintained power tools and equipment for each job.
  • Read and interpreted electrical, mechanical, and architectural drawings and electrical code specifications for wiring layouts.
  • Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
  • Used testing instruments such as ohmmeters, voltmeters, ammeters, and multimeters.
  • Connected appropriate parts to deliver power to audio and visual equipment, signaling devices and heating or air conditioning systems.

Timeline

Framer

HAF Contruction