1.Silver Medal: Takes Ownership(Individual)
2. Bronze Medal: Succeed Together(Individual)
3. Insta Award(infosys)
• Joining the BOW call with SMT’s, plan/ strategy creations for upcoming releases based on the road map calls.
• Engaging with BA/App team’s and get the requirement and analyzing the requirements. Provide knowledge base to the team to keep them ready for the upcoming releases.
• Representing the DSR, taking the accurate calls on RAG status with right AMBER Regions and B2G plans especially when the project is on non-green.
• Joining Tech Review, Daily Standup & Sprint health review calls from and highlight the risks on time.
• Reviewing the results at every stage of the billing process and highlight & fix the permanence issues on time.
• Being proactive with all the app stakeholders right from environment readiness activities, DB refresh requests, configurations & code deployments and to keep the environment ready to start with NFT activities on time.
• Prepared Test Plan based on Requirements by incorporating User Profiles, Configurations, Environments, Risks, Test Scenarios, Schedules and Analysis.
• Involved in data loading activities in to PTE, executed the billing process in GBS with the help of ETL jobs (Source system to staging and staging to mart).
• Involved in executing the list of specific autosys jobs to process the data for all the billing processes.
• Prepared test execution reports for ETL job executions along with server metrics each and every billing process is running for multiple branches.
• Prepared Test Cases and independently develop HP LoadRunner test scripts according to test specifications/requirements.
• Enhanced the test scripts using Web HTTP/HTML.
• Created Test Matrix, Traceability Matrix and performed Gap Analysis.
• Developed Scenarios in Performance Center based on the User Load and Transaction Volume.
• Executed stress/load/Endurance scenarios and regression testing for various operations and performed detailed test analysis reports.
• Analyzed AWR Report after test execution whenever we run in to performance issues and take them towards the needed tunings with the right defect tracking mechanisms.
• Developed various reports and metrics to measure and track testing effort.
• Internal Results reviews, providing test results walk-through to both App and PS teams and take the release towards the signoff/ closure.
Performance testing Tools:
Monitoring Tools:
Defect Tracking Tools:
Others:
ISTQB Certified Tester(ITB)
Cooking
Movies
Campings/Road Trips
Playing Cricket